Govt readies contingency plan for coal supply to NTPC plants

This is being done due to excessive rains in the Northern Coalfields area during the last few days

NTPC
NTPC Photo: Wikipedia
Press Trust of India New Delhi
Last Updated : Sep 30 2016 | 8:30 PM IST
With the supply of coal being affected due to excessive rains, the government on Friday said that contingency plan has been drawn up to overcome the hurdles in dispatch of supply to NTPC's thermal power plants, including Rihand and Vindhayachal.

The government has drawn up contingency plan for coal based power plants at Anpara, Rihand, Singrauli and Vindhyachal affected due to excessive rains in the Northern Coalfields (NCL) area during the last few days, an official statement said.

"This unforeseen natural calamity has damaged roads, railway tracks and there is waterlogging in the open cast NCL mines. This has affected coal supply to Anpara, Singrauli, Rihand and Vindhyachal thermal power stations," it said.

Contingency plan has already been implemented to ensure that the power supply due to this is not affected. If required, states can get the supply from alternate sources and power exchanges, it added.

The Sub Group Monitoring Committee reviewed the coal supply situation which was affected due to excessive rains and has issued a contingency plan to overcome the hurdles in coal supply to the thermal power plants receiving coal from NCL.

"It has directed to the concerned agencies to put 6 numbers of Bogie Open Bottom Rapid discharge (BOBR) rakes in circuit for coal supply to Anpara and Singrauli thermal power station (TPS) till the merry-go-round (MGR) supplies to these plants are resumed," it said.

"In addition to it, 2 Box 'N' railway rakes per day each from BCCL, CCL and ECL subsidiaries of CIL (Coal India) are being sent to the Rihand and Vindhayachal units of NTPC as the coal for these units is diverted to the Anpara and Singrauli TPS," it added.

The imported coal stock lying at the port is also being moved to the Vindhayachal NTPC units. These pithead plants are designed to receive coal through MGR and therefore were facing difficulty in unloading coal through railway rakes. The coal supply is expected to improve in the next few days with the weather conditions improving.

The Sub Group Monitoring Committee consists of representatives of ministry of power, railways and coal besides Niti Aayog, CIL, and SCCL and is headed by Joint Secretary Ministry of Coal and reviews the coal supply situation to the power plants on a regular basis.
*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

First Published: Sep 30 2016 | 8:16 PM IST

Next Story