Okhla waste-to-energy plant here was today allowed to function by the National Green Tribunal which said it need not be shut down or shifted as it is non- polluting now but directed it to pay an environmental compensation of Rs 25 lakh for its deficient operation earlier.
A bench headed by NGT Chairperson Swatanter Kumar while passing a slew of directions in the "interest of public health and environment", said environmental compensation (EC) be paid to the Central Pollution Control Board (CPCB) and the Delhi Pollution Control Committee (DPCC) in equal shares for utilising for prevention and control of air pollution in the area.
The bench, in its 142-page judgement, said the Okhla plant should not be directed to either shut down or shifted to another site as there is definite evidence before it to arrive at a finding that the project proponent is compliant and non-polluting.
The bench said the project proponent, M/s Jindal Urban Infrastructure Ltd, is liable to pay EC of Rs 25 lakh in terms of provisions of the NGT Act for the pollution resulting from deficient functioning/operation of 'waste-to-energy plant' and its stack emissions being in excess of prescribed parameters upto the period of December 18, 2014.
"The waste-to-energy plant would be permitted to operate till further orders of the tribunal and/or CPCB/DPCC, as the case may be. The plant shall operate to its optimum capacity and would not cause any environmental pollution," it said.
The tribunal's verdict came on a petition filed by residents of Sukhdev Vihar alleging that the plant was releasing "toxic" emissions which had affected their health.
The bench made it clear that if the plant is found to be
deficient in its operation or violates prescribed standards of emissions, it would be "liable to pay environmental compensation of Rs five lakhs per incident, in addition to such other order or directions that may be passed by the regulatory authorities and this tribunal including closure of the plant".
The bench, also comprising judicial members U D Salvi and Raghuvendra S Rathore and expert members Bikram Singh Sajwan and Ranjan Chaterjee, dismissed the claim of applicants challenging the environment clearance granted to the project proponent by the Ministry of Environment, Forest and Climate Change on April 21, 2007, saying it was time-barred.
It said that the plant's emissions should be strictly compliant with the prescribed standards imposed by CPCB or DPCC in the consent to operate or joint inspection reports and added that the plant will be permitted to operate subject to the stringent standards and regular inspections and monitoring by the joint inspection team constituted by it on March 13, 2013.
The bench asked the joint inspection team to conduct monthly inspection of the plant and file before it a detailed report for appropriate directions.
"The joint inspection team shall take stack as well as ambient air quality samples and analyde them in two different laboratories i.E., CPCB and DPCC laboratories. The project proponent should construct an automatic segregation plant, operative within one week from the date of pronouncement of judgement, if not, made operative by January 31," it said.
It directed the project proponent to ensure that its brick manufacturing plant, utilising fly ash is operative to its optimum capacity and to minimise transportation of fly ash generated from the waste-to-energy-plant to a landfill site.
"The transportation of fly/bottom ash shall be carried out strictly in accordance with the rules while ensuring that there is no fugitive release of ash into the air either during the loading, unloading and transportation," the bench said.
The bench also directed the Delhi government and other local authorities to make it mandatory for all construction projects, be it public or private, to use the bricks manufactured from fly ash in their construction activities.
(Reopens LGD21)
The bench said, "CPCB, DPCC and MoEF&CC shall direct the NCT Delhi as well as all the local authorities concerned to provide more landfill sites in Delhi and such sanitary landfill sites should be maintained and utilised strictly in accordance with the Solid Waste Management Rules of 2016."
It also directed the Centre, the Delhi government and other local authorities to make contribution to ensure establishment of more waste-to-energy plants at appropriate sites.
"Existing landfill sites should be improved, their heights should immediately be reduced and bio-stabilisation of all the landfill sites should be expedited. The reusable material particularly plastic waste should be recovered and utilised for construction of roads (national highways) and embankments in NCT of Delhi or any other area," it said.
It also directed the plant owner to improve the green belt by planting trees all around the site.
The bench noted that Delhi is generating 14,100 metric tonnes of mixed waste every day, which indicates the magnitude of problems related to handling and disposal of municipal solid waste (MSW) in the national capital.
"The need of the hour is to ensure processing of the municipal waste with least residue by recourse to developed and tested technologies in that behalf. This waste is going to increase by the day. The local authorities ought not to take it as a commercial venture but should be very cautious of the fact that it is their statutory duty to process the MSW in accordance with the Rules of 2016 and ensure that there are no adverse impacts on public health and environment.
"They need to tackle this huge problem with utmost sense of sincerity and objectivity. Similarly, the public at large should not propagate the principle of 'not in my backyard' that too founded on no scientific data but only on mere apprehensions," it said.
*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

First Published: Feb 02 2017 | 5:42 PM IST

Next Story