RIL, in 2001 and again in 2007 had acquired seismic data to study hydrocarbon reservoir several hundred meters below the sea-bed, in its Bay of Bengal KG-D6 block and in the neighbouring blocks of ONGC, without knowledge of the state-owned firm, it alleged.
The data acquired by RIL established that the Dhirubhai-I and III (D1&D3) gas fields in its KG-D6 block have a considerable extension into ONGC’s adjoining blocks KG-DWN-98/2 (KG-D5) and Godavari PML, said in a written submission to the AP Shah committee looking into the gas dispute between the two firms. “RIL concealed and did not reveal the data to ONGC,” the company alleged. “RIL drilled its production wells at such locations (close to common boundary of the blocks) and with such angles so as to extract maximum gas from reservoirs falling under ONGC's blocks.”
When contacted, an RIL spokesperson said, “We deny all the allegations. We are confident of demonstrating we have worked absolutely within our entitlement and there has been no impropriety on our part whatsoever.” Quoting from the report of US-based independent consultant D&M, jointly appointed by RIL and ONGC to study gas migration between their blocks, the state-owned firm said 8.983 billion cubic metres (bcm) of the 58.676 bcm produced by D1&D3 fields till March 31, 2015, came from KG-D5 and Godavari PML.
“The study also established that a total of 11.125 bcm of gas from ONGC blocks has migrated to RIL block due to the production activity,” the company said adding RIL had drilled four wells — A5, A9, A13 and B8 close to ONGC’s blocks. “One well, B8, is as near as about 50 meters to ONGC’s block boundary. Well B8 and A9 are even inclined towards ONGC's reservoirs,” the latter said adding KG-D6 gas production in April 209 started with four wells drilled close to block boundaries of ONGC.
Stating that the "extraction of gas by RIL from ONGC's block has been the result of a well-planned and deliberate strategy by RIL and simultaneously as a result of several omissions on the part of DGH", ONGC demanded that the private firm needs to compensate it in "US Dollar together with interest at the rate of 18 per cent per annum for production from April, 2009."
The government had in December set up a one-man Committee under Law Commission Chairman A P Shah to look into acts of omission and commission and recommend compensation to ONGC whose natural gas from Bay of Bengal block had flowed to adjoining Dhirubhai-1 and 3 fields of Reliance Industries.
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
)