ONGC has divided 12 oil and gas finds in the block KG-DWN-98/2 or KG-D5 and gas discovery in an adjacent G-4 block in the Bay of Bengal into three clusters to quickly bring them to production, a senior company official said.
The 7,294.6 sq km deepsea KG-D5 block has been broadly categorised into Northern Discovery Area (NDA - 3,800.6 sq km) and Southern Discovery Area (SDA - 3,494 sq km).
The company plans to develop the 11 oil and gas finds in the NDA together with one gas find in G-4 block at an investment of USD 8.843 billion, he said.
"The investment will be for drilling 45 development wells, an array of sub-sea pipelines carrying gas to a fixed platform for processing and a pipeline to carry gas form it to an onshore terminal. Oil will be transported to a floating production system (FPSO) that will transfer it to ships for taking to refineries," he said.
ONGC plans to develop the discoveries in the block in three clusters -- 14.5 million standard cubic meters per day of gas for 15 years from Cluster-1 comprising of D&E finds of NDA in KG-D5 block and G-4 find in the a neighbouring area.
Cluster-2A mainly comprises of oil finds of A2, P1, M3, M1 and G-2-2 in NDA which can produce 75,000 barrels per day (3.75 million tonnes per annum).
Cluster 2B, which is made up of four gas finds -- R1, U3, U1, and A1 in NDA -- envisages a peak output of 14 mmscmd of gas, with cumulative production of 32.5 bcm of gas in 14 years.
"We plan to get first gas by mid-2018 and first oil by mid-2019," he said.
Cluster-3 is the UD-1 gas discovery in SDA. "UD-1 lies in water depth of 2400-3200 meters and there is no technology to produce from such depths. And so Cluster-3 is presently not being pursued for development," he said.
Gas produced from Cluster-1 is proposed to be taken to a Fixed Platform in shallow water depths through an 18-inch, 16.1 km pipeline and treated and subsequently evacuated to Odalarevu onshore terminal in Andhra Pradesh through 20-inch, 35.5 km pipeline for sales.
Oil produced from Cluster-2 is proposed to be taken on to an FPSO (Floating Production Storage and Offloading) anchored in high-sea through an 18-inch, 21.5 km pipeline. While oil will then be transfered to tankers for transportation to refineries, gas produced alongside will be evacuated on to Fixed platform through an 18-inch, 21.4 km pipeline.
The official said there is an existing terminal at Odalarevu, for processing of hydrocarbons received from offshore fields: G-1, Vasishta and S-I.
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
)