Rail connectivity for Char Dham pilgrims soon

Image
Press Trust of India New Delhi
Last Updated : May 11 2017 | 12:22 PM IST
The Indian Railways will commence this week the final location survey for providing rail connectivity to the four important Hindu shrines in the hills of Uttarakhand at an estimated cost of over Rs 40,000 crore.
The Rail Vikas Nigam Limited (RVNL), a railway PSU, has been entrusted with the task of undertaking the final survey for rail connectivity to Chardham - Gangotri, Yamunotri, Badrinath and Kedarnath - through Dehradun and Karanprayag.
Earlier, RVNL had undertaken a reconnaissance engineering survey in 2014-15 and submitted a report in October 2015.
As per the reconnaissance survey, the total route length is 327 km and will cost Rs 43,292 crore.
The REC survey recommends 21 new stations, 61 tunnels totalling into a tunnel length of 279 km and 59 bridges.
As the alignment will pass through the rugged mountainous terrain of the mighty Himalayas, the Railways has to meet the challenges of rail construction.
The existing rail heads or the nearest railway stations to the proposed Char Dham are Doiwala, Rishikesh and Karanprayag.
Railway Minister Suresh Prabhu shall lay the foundation stone for the final location survey for single broad gauge line in Badrinath on May 13.
The four dhams have their varied and distinctive elevation levels along with spiritual significance.
The Yamunotri tracing the origin of the river Yamuna is situated at 3,293 metre above sea level while the Gangotri tracing the origin of the river Ganga is situated at 3,408 metre above sea level.
Kedarnath housing the shrine of Lord Shiva, is one of the 12 Jyotilingas at 3,583 metre height, while Badrinath housing the shrine of Lord Vishnu is at 3,133 metre height above sea level.
Besides pilgrims, a large number of foreign and domestic tourists throng the scenic state.
The ambitious project envisages bringing in a new era of safe and comfortable travel, said a senior Railway Ministry official.
The Indian Railways is also pursuing its ambitious project of constructing a new rail line between Rishikesh and Karanprayag and efforts are underway to fast-track the project.
These rail projects shall add momentum to the progress of the State by connecting far-flung areas besides boosting opportunities for tourism and economic development.

Disclaimer: No Business Standard Journalist was involved in creation of this content

*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

First Published: May 11 2017 | 12:22 PM IST

Next Story