Giving it a 10/10 rating, LOC tournament director Javier Ceppi said the revamped stadium is at par with any world-class venue that has hosted a FIFA World Cup final.
"If you ask me it looks like a museum, be the entrance or the inside. Or like the teams said it looks the lobby of a five-star hotel," Ceppi said, thanking West Bengal Chief Minister Mamata Banerjee for getting the work done in two and half years' time.
"They (West Bengal government) took the challenge. This stadium now can be compared to other stadiums in the world that have hosted a FIFA World Cup final."
The revamp of the stadium, formally known as Vivekananda Yuva Bharati Krirangan, which was taken up on February 1, 2015, cost the West Bengal government more than Rs 100 crore.
Banerjee will formally inaugurate the stadium from Uttar Kanya, the branch Secretariat of Government of West Bengal in Siliguri, North Bengal, on September 12.
"It's not a single person more. That's the capacity of the stadium for a safe evacuation for every part and every spectator of the stadium within eight minutes," Ceppi said.
However, the stadium can accommodate about 80000.
The stadium is 98 percent complete and Ceppi said it's their responsibility to take it to the next level.
"Now, we need the transition from a museum to a football stadium to host the World Cup. It's not major work but just two or three things," Ceppi said.
"All six of them are like our kids, it's impossible to decide the best. I'm not being politically correct, but if you go to every single stadium in country the amount of work has gone is fantastic."
"With certain touch-ups it would be a fantastic facility operationally as well. It's not only about looks but substance as well. It does look like a 10/10. Bengalis must feel proud about the stadium now," Ceppi said after principal secretary (sports) Saeed Ahmed Bawa signed the official document to hand over the stadium.
Work on outer areas like a subway, the Media and VIP Tribune are among other things that are in progress.
Sports Minister Aroop Biswas said their government has borne the entire cost of the stadium revamp.
"101 per cent of the cost is borne by the state government. FIFA never allots money, whatever work you're seeing is funded by the Government of West Bengal," Biswas said.
"It was an old structure. From time to time, we had to take the expert advice of IIT Kharagur and sometimes BESU (Indian Institute of Engineering Science and Technology, Shibpur), so till it's fully over we cannot exactly say the amount but it's estimated to be more than Rs 100 crore."
"We have had 105 meetings here with intricate details with chief minister directly overseeing the progress. That we are chosen as the hosts for the final makes it the best. Nothing further needs to be said," Pandey said.
Disclaimer: No Business Standard Journalist was involved in creation of this content
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
