He would turn out to be off by 16 years.
Gruner's sketch and technical paper called "Journey through the Gotthard Base Tunnel (GBT) in the year 2000" planted the seeds for a venture that will be launched this week and aims to transform travel through the heart of Europe.
Constructing the 57-kilometre (35-mile) rail tunnel took just over 12 billion Swiss francs (USD 12 billion, 11 billion euros) and some 2,400 workers, according to Swiss government statistics.
The bumpy road from Gruner's initial idea to the official start of construction in 1999 included bureaucratic delays and concern over the project's financial viability.
Switzerland's federal government set up a committee in 1963 to look into the building of an alpine base tunnel but opinions were split over various proposals, before an official body eventually ruled in 1983 that the project was "not urgent."
Momentum in favour of the GBT built again ahead of a 1992 referendum, which supported the project, but public outcry about the expense put work on hold.
"It's a big engineering achievement," said Martin Knights of the London-headquartered Institution of Civil Engineers.
The tunnel runs from Erstfeld in the central Swiss canton of Uri, to Bodio in southern Ticino canton, and will shave the train journey from Zurich to Milan in northern Italy down to two hours and 40 minutes, roughly an hour less than it currently takes.
The new route also aims to make rail freight more efficient, including by supporting heavier cargo, which should reduce the number of diesel-guzzling lorries on the roads, in turn improving traffic and curbing pollution.
In a study of the GBT's possible economic benefits, Swiss bank Credit Suisse forecast a range of positive impacts driven by an easier movement of goods, growth in day-trip tourism and higher property values in the affected cantons linked to increased accessibility.
German Chancellor Angela Merkel, French President Francois Hollande and Italian Prime Minister Matteo Renzi, along with Swiss officials, are due to attend Wednesday's grand opening, which will feature a ceremonial run.
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
