It is not true that India is not reducing coal-based power generation capacity in the energy mix, a senor government official said, adding that the country is targeting over 64 per cent of non-fossil fuel-based capacity by 2030.
India has set the target of having 500GW of renewable energy by 2030. Coal-based power generation, however, ensures stable operation of the electricity transmission grid.
"It is not true that we are not reducing coal. We are in the business of energy transition. But keeping in mind energy security and supply to each and every consumer, we have to provide electricity to all types of consumers including commercial, domestic and industrial," Chairman, Central Electricity Authority, Ghanshyam Prasad said at the BCC&I Environment and Energy Conclave here.
India's power infrastructure is mostly dominated by coal (based generation) as it constitutes more than 50 per cent in terms of capacity. In terms of output, the share of fossil fuel-based energy is 70 to 74 per cent, he said.
According to the latest Central Electricity Authority data, India has about 423 GW of power generation capacity, which includes 206GW coal-based capacity and around 7 GW lignite based.
He pointed out that India is already at 45 per cent (of non-fossil fuel based capacity) and reaching 50 per cent (renewable energy in energy mix) is not a challenge, but the country is targeting somewhere around 64 per cent-plus (non-fossil fuel based capacity) by 2030.
The country has recorded its peak power demand at 234 GW on August 17, 2023. In December last year, the power ministry has estimated the peak demand of 229 GW during this summer.
The ministry has made it mandatory for plants using imported coal to run at full capacity and also asked domestic coal-based plants to import the dry fuel for blending to avoid shortage in view of high power demand.
The official highlighted the importance of storage of solar and wind energy and suggested looking at pumped hydro storage projects as an alternative in view of the higher cost of battery storage.
"We have 4,700 MW hydro pumped storage capacity in the country out of which 1,200 MW to 1,300 MW is not operating. We need 40 GW in this pumped storage hydro (space)," he added.
(Only the headline and picture of this report may have been reworked by the Business Standard staff; the rest of the content is auto-generated from a syndicated feed.)
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
)