Work in progress to power up Rajasthan govt's solar energy capacity

"The day is not far off when the state will not only fulfil its own needs but also supply electricity to other areas of the country," Rajasthan Minister of State for Energy Heeralal Nagar said

solar panel
To bridge the power gap, the state is planning to increase its dependence on solar energy from the current 12-14 per cent to over 40 per cent of consumption by 2030.
Anil Sharma Jaipur
2 min read Last Updated : Jan 16 2025 | 4:41 PM IST
The Rajasthan government has started work on setting up solar power projects with a capacity of 17 gigawatt (Gw) in its bid to boost electricity infrastructure and production in the state. 
 
“The day is not far off when the state will not only fulfil its own needs but also supply electricity to other areas of the country,” Rajasthan Minister of State for Energy Heeralal Nagar said.
 
Rajasthan is one of the leading states in solar energy production. With a solar radiation capacity of 5.72 kilowatt-hour (kWh) per square meter per day, the highest in the country, Rajasthan has been a preferred location for the establishment of renewable energy projects. 
 
Also, the state has the highest average number of sunny days at 352 per year. The total potential of solar power in Rajasthan is estimated to be about 142 Gw, which is nearly 19 per cent of the country.
 
To bridge the power gap, the state is planning to increase its dependence on solar energy from the current 12-14 per cent to over 40 per cent of consumption by 2030.
 
Prem Biyani, executive president of All Rajya Trade and Industries Association, hailed the government’s solar push, saying the solar energy production ramp-up was a long-standing demand. He flagged the difference between the prices of electricity bought from other states and the solar energy produced in Rajasthan. 
 
During the recently held Rising Rajasthan Investment Summit in December, about 530 memoranda of understanding (MoUs) were signed worth more than ~2.6 trillion. The state plans to touch a figure of ~5 trillion in the next five years, the minister said, adding that about 74 per cent of the state farmers were getting electricity during the day.
 
“In the coming days, we are trying to make the system even better, so that the remaining farmers can also be provided electricity during the day. This work is slated to be completed by the end of the rabi season or the winter crop season."
*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

Topics :solar energyrajasthansolar capacity

First Published: Jan 16 2025 | 4:41 PM IST

Next Story