Coal India ups investment to Rs 15,700 cr to boost mechanised transport

Plan encompasses 14 additional projects from its earlier count of 35

Coal India
Of the 14 projects in the phase II, CCL accounts for five with 62.5 million tonnes per annum capacity
Avishek Rakshit Kolkata
2 min read Last Updated : Jun 30 2020 | 2:34 AM IST
Coal India (CIL) has identified 14 additional first-mile connectivity (FMC) projects where it will invest Rs 3,400 crore more in the second phase to boost mechanised transport and loading. This will take its total investment in the project to Rs 15,700 crore. 

The state-owned miner transports 151 million tonnes (mt) of coal through mechanised system and loads through coal-handling plants (CHPs) and silos from 19 projects, which will now be increased to 557 mt by 2023-24 through projects in phase 1. The projects under phase II will start contributing once the formalities of finalisation are over.  

Under the phase I, the state-owned miner has zeroed down on 35 projects, each having 4 mt of capacity from six of its subsidiaries with a capital of Rs 12,300 crore. Their combined project capacity is 406 mt. Under the phase II project, 14 additional projects have been identified, which will entail an investment of Rs 3,400 crore having a capacity to handle 100.5 mt of coal.


Of the 14 new projects, Central Coalfields (CCL) accounts for five with 62.5 mt per annum capacity. Mahanadi Coalfields with a solitary project has 20 mt per annum capacity. Eastern Coalfields has seven and South Eastern Coalfields has one project with a capacity of 14 mt per annum and 4 mt per annum, respectively.

FMC is the transportation of coal from pitheads to despatch points. This move aims to replace the existing road transport between the two points and switch over to a seamless mechanised coal transport through conveyor belts, which will reduce dust pollution. It will also have the benefit of computer-aided loading of railway wagons.

As a corollary, the Maharatna company will set up CHPs with silos having rapid loading systems, which will have benefits like crushing, sizing of coal, quicker and better quality coal loading.

 “This will be a tipping point in our coal transportation in the first mile. The multiple advantages include easing the load on road networks, saving on diesel costs, cleaner environment, and stoppage of possible pilferage,” said a senior executive of the firm.

One subscription. Two world-class reads.

Already subscribed? Log in

Subscribe to read the full story →
*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

Topics :Coal IndiaCILCentral Coalfields

Next Story