The present status of our nuclear power sector?
We have installed capacity of 5,780 Mw, through 21 reactors at seven sites. Kudankulam (in Tamil Nadu) unit-2 of 1,000 Mw was made critical (meaning, the run-up has begun for operationalising) on July 10. This unit, when it gets connected to the grid and reaches full power, will add 1,000 Mw, taking the installed capacity to 6,780 Mw.
At the moment we are constructing four PHWRs (pressurised heavy water reactors) of 700 Mw each, two in Rajasthan and Kakrapar (Maharashtra). We have launched two more VVER (Russian term for PWR) reactors of 1,000 Mw each at Kudankulam (units 3 and 4) and two more PHWRs of 700 Mw each at Gorakhpur, Haryana. All these will add 6,200 Mw and when they get completed in a phased manner by 2023, we, at NPCIL, will be generating 12,980 Mw. This is the firm commitment.
Looking beyond 2023, we have started building our potential by acquired land in few more sites and are in the process of acquiring some other sites. We have started also obtaining certain clearances including EC, pollution control board clearance, conducting the geo-technical studies, etc. These sites have the potential to accommodate 12 PHWRs of 700 MW each and 18 large size LWRs (light water reactors) in the range of 1,000 Mw to 1,650 Mw capacity.
Of the proposed LWRs, two sites in Andhra Pradesh and Maharashtra are in the process of development. The environment is favourable for nuclear power capacity addition. The finance minister, in his Budget speech, announced Rs 3,000 crore a year towards equity for the next 15 years. The sector is poised for accelerated growth.
Do you see India's civil nuclear liability law continue to be a major block?
There should not be any concern. The only concern suppliers had earlier was that there was no mechanism available to insure their liabilities. Now, the India Nuclear Insurance Pool (INIP) has been created, which has already offered operators' policy to us.
Suppliers’ risk or liability they can cover and in my knowledge, INIP will this month offer insurance products for suppliers.
Is the Jaitapur project in Maharashtra, which faces opposition from various sections, being developed?
We have acquired the land and have every intention of using that site. We are discussing with (UK-based) EDF the technical specifications and business model. I won’t call it really a delay, as these are complex discussions, encompassing various aspects on choice of technology, suitability to the country and saleability of the power, particularly competiveness of rates. All this takes time.
Recently, Westinghouse offered to provide reactors for the Andhra Pradesh project.
Westinghouse has given an offer; we are studying and discussing it with them.
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app