The decision was taken at a recent meeting of the power ministry. Power Finance Corporation (PFC), the nodal agency for UMPPs in the country, has invited preliminary bids for selection of developers.
As per the revised standard bidding documents, the projects would be set up on design, build, finance, operate and transfer (DBFOT) basis.
Also Read
OIPL, a special purpose vehicle (SPV) formed for implementing the UMPP, has been authorised by the Odisha government to take all necessary decisions that may be required for selection of the developer.
The decisions are to be taken by the SPV in accordance with the ‘Guidelines for Determination of Tariff by Bidding Process for Procurement of Power by Distribution Licensees’ issued by the Union power ministry under Electricity Act-2003.
State-owned power trading firm Gridco Ltd has been appointed as the lead utility among all the utilities that will be allocated power from the Bhedabhal UMPP. Gridco will discharge the obligations on behalf of all the individual entities.
The government of India recently scrapped the initial bids received from 20 power companies for setting up this UMPP since the bids were invited as per the previous standard bidding documents (SBDs).
Bigwigs in the power sector like NTPC, Tata Power, Adani Power, JSW Energy and Jindal Steel & Power Ltd (JSPL) had evinced interest in developing the UMPP.
The UMPP needs 3,100 acres of land in all. Odisha would get 1,300 Mw as its share from this project. Water for this UMPP has been allocated from the Ib river. Check dams and barrages would be put up on the river for storage and drawal of water.
Meenakshi, Meenakshi-B and Dipside Meenakshi coal blocks have been allotted for the UMPP with a total reserve of 880 million tonnes.
Notification under Section 6 (1) of Land Acquisition Act has been issued for acquisition of private land totalling to 2732.56 acres in six villages in Sundargarh district.
Two more UMPPs will be set up in Odisha. While the second UMPP will be located at Bijoypatna in Chandbali tehsil of Bhadrak district, the third UMPP will come up at Narla under Kesinga sub-division in Kalahandi district. The sites have been selected after field visits by PFC officials.
Two subsidiaries- Sakhigopal Integrated Power Company Ltd and Ghogarpalli Integrated Power Company Ltd have been formed by PFC for executing these two UMPPs. The second and third UMPPs would contribute 2,000 Mw each to the state grid.
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
)