Automated control systems for Kudankulam nuclear plants to in 2018

The automated control systems will start arriving to India from Russia

A policeman walks on a beach near Kudankulam nuclear power project (photo: Reuters)
A policeman walks on a beach near Kudankulam nuclear power project (photo: Reuters)
IANS Chennai
Last Updated : Dec 26 2016 | 11:56 AM IST
The automated control systems for two nuclear power plants in Tamil Nadu's Kudankulam will start arriving to India from Russia 2018 onwards, the Russian State Nuclear Corporation (Rosatom) said.

Automated control systems are key components needed to ensure the safe operation of the nuclear power plant. They include a range of special tools for safety and regular operation mode maintenance.

These systems for the 1,000 MW units - 3 and 4 would be manufactured by a Rosatom affiliate -- Automated Control Systems.

According to a statement by the Russian company an agreement to supply automated control systems was signed between Rosatom-Automated Control Systems and Atomstroyexport -- the latter responsible for nuclear power plant construction.

The agreement said that the equipment supply for Kudankulam units 3 and 4 would begin in 2018 and 2019, respectively. After that the installation and setup would begin.

"All the software and hardware tools are to be manufactured at Russian factories. That's the distinguishing aspect of the contract. The project is a vivid example of localisation of innovative production," Andrey Butko, CEO of Russian-Automated Control Systems said.

India's nuclear power plant operator, Nuclear Power Corporation of India Ltd (NPCIL) is setting up 1,000 MW units at Kudankulam in Tirunelvelli district, around 650 km from here.

The company has completed two units and construction activities for the third and fourth units have started.

The general agreement for the construction of Units 3 and 4 was signed with Rosatom, in 2014.

At present, the implementation of the Kudankulam Nuclear Power Project (KNPP) involves the construction of six power units equipped with VVER-1000 reactors.

The roadmap for cooperation between Russia and India in the sphere of nuclear power provides for the construction of a total of 12 power units in different locations in India, including the site of the KNPP.


*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

First Published: Dec 26 2016 | 10:20 AM IST

Next Story