Rail project caught in unsavory political controversy

RNVL implementing 125.09 km long rail project in Garhwal region with a preliminary cost of Rs 4,295.3 cr

Shishir Prashant Dehradun
Last Updated : Mar 14 2014 | 4:58 PM IST
Ahead of the general election, the Rishikesh-Karanprayag rail line, a dream project which is expected to bring prosperity in the backward Garhwal region in Uttarakhand, is caught in an unsavory political controversy after developing slowdown syndromes.

Former railway minister and Congress MP from Pauri Satpal Maharaj has accused the state government of not handing over the land to the Railway Vikas Nigam Limited (RVNL) which he claimed is delaying the project.

RNVL is implementing the 125.09 km long rail project in the Garhwal region with a preliminary cost of Rs 4,295.3 crore, the foundation stone for which was laid three months before the 2012 assembly election in the hill state. The project was one of the key poll planks of the ruling Congress at that time.

“For the past two years, I had been requesting former chief minister Vijay Bahuguna and Chief Minister Harish Rawat to handover the land for the construction of Rishikesh-Karanprayag rail line repeatedly, but till now, the land has not been given to the Railway Vikas Nigam,” said Maharaj, a political rival of the Chief Minister amid renewed infighting in the ruling Congress.

Rawat is apparently peeved over the Chief Minister’s decision not to give horticulture portfolio to his wife Amrita, who is a state cabinet minister following an alleged polyhouse scandal which rocked the state recently.

Concerned over the delay in the Rishikesh-Karanprayag rail project, the then Chief Minister Bahuguna in October last had called on Union Railways Minister Mallikarjun Kharge at New Delhi to expedite the project.

Bahuguna had expressed the hope that the railways would give top priority to the national project. Besides, the Rishikesh-Karanprayag project, Bahguna had also held discussions with the Minister on Bageshwar-Tanakpur rail project which is also hanging fire for the past several decades.

The government has already assured all possible support from the state government for the new project which has the potential to become the lifeline of the backward Garhwal region. The proposed rail project would bring in prosperity in the hilly areas and generate employment opportunities for the people, experts said.

The rail project would pass through Dehradun, Tehri, Pauri and Chamoli districts and main railway stations would be at Rishikesh, Karnprayag, Srinagar, Rudraprayag and Devprayag. There would be total 128 bridges including 45 large and 83 small one, while, total number of tunnels would be 81.
*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

First Published: Mar 14 2014 | 4:58 PM IST

Next Story