Government amends electric vehicle charging guidelines

Image
ANI General News
Last Updated : Oct 04 2019 | 8:30 PM IST

In order to address the range of issues of Electric Vehicle Owners, a phase-wise installation of an appropriate network of Charging Infrastructure throughout the country has been envisaged in the new electric vehicle guidelines.

The new guidelines ensures that at least one charging station should be available in a grid of 3 Km X 3 Km in the cities and one charging station at every 25 Km on both sides of highways/roads.

"It has been envisaged that in the first phase all megacities with a population of 4 million-plus as per census 2011, all existing expressways connected to these megacities and important highways connected with each of these megacities may be taken up for coverage," an official statement said.

In the second phase, big cities like state capitals, Union Territory headquarters may be covered for distributed and demonstrative effect.

The guidelines and standards for charging infrastructure for the electric vehicles were issued by the Ministry of Power in December 2018.

The changes in the guidelines were made after the Power Ministry received a number of suggestions from various stakeholders.

After careful examination, it was decided to adopt some of the suggestions and issue the revised guidelines.

Ministry of Power has issued the revised guidelines and specifications regarding the charging infrastructure for electric vehicles on October 1 and shall supersede the earlier guidelines.

To address the range anxiety in inter-city travel and long-range or heavy-duty EVs it has been provided that fast-charging station for long-range or heavy-duty EVs like buses or trucks shall be installed at every 100 Kms, shall be installed one on each side of the highways or road located preferably alongside the Public Charging Station (PCS).

Bureau of Energy Efficiency (BEE), a statutory body under Ministry of Power has been nominated as the Central Nodal Agency.

Further, a provision for State Nodal Agency for the respective states has been provided for in the guidelines. The roles of the respective Nodal Agencies have been specified. These Nodal Agencies will act as the key facilitator in the installation of Charging Infrastructure for Electric Vehicles throughout the country.

Disclaimer: No Business Standard Journalist was involved in creation of this content

*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

First Published: Oct 04 2019 | 8:17 PM IST

Next Story