About 100 tons of highly radioactive water overflowed and spilled from a tank at the crippled Fukushima No. 1 plant, Tokyo Electric Power Co. (TEPCO) said.
TEPCO reportedly said the over flown water did not reach the ocean, as there was no drainage ditch that connects to the sea near the leaked area around the tank, which is in an area called H6.
According to Japan Times, Tepco said the water was supposed to go to tanks placed at the E area, which is west of H6, but it went to the tank that was already storing water at H6 and overflowed.
While cesium was removed from the leaked water, it contains other radioactive materials, like strontium, the report said.
Tepco said the level of those that emit beta rays was 230 million becquerels per liter.
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
