The length of the railway line will be 467 km. The completion period of the project will be five years.
Besides travelling people, industries in and around Miraj-Londa section will have additional transport capacity to meet their requirements. Doubling of this line will greatly ease the ever increasing freight traffic between Pune-Miraj-Londa section thereby increasing the revenue of Railways.
Background:
Miraj is a junction station on Londa to Mumbai double line route via Sangli, Karad, Satara. The Pune-Miraj section is non-electrified single line on diesel traction and it is oversaturated. The additional traffic running over and above 100% of utilization is proposed to be diverted on the proposed doubling. The doubling of the section would come as an advantage as it would strengthen the rail network necessary to operate more passenger trains with increased speed and better efficiency. Doubling between Bangalore-Hubli and Hospet-Vasco-da-gama is already in progress. Once these works are completed, there will be tremendous increase in traffic over the Miraj-Londa section. Therefore, doubling between Pune-Miraj-Londa is required.
Powered by Capital Market - Live News
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
