629 buildings in 18 states identified for rooftop solar projects
The Ministry of Urban Development has launched a mission to generate 100 MW of solar power in the next two years through roof mounted solar panels. Towards achieving this goal, Central Public Works Department (CPWD), the construction major under the Ministry and Solar Power Corporation of India (SPCI) of the Ministry of New and Renewable Energy Sources today signed a Memorandum of Understanding. The MoU was signed by B.B.Bhatia, Director General of CPWD and Dr. Ashvini Kumar, Managing Director of SECI.Minister of Urban Development M. Venkaiah Naidu, Minister of Power and NRES Piyush Goyal, Minister of State for Urban Development Babul Supriyo, Secretary(UD), Shankar Aggarwal and senior officials were present on the occasion.
As per the MoU, CPWD would provide 629 buildings owned and maintained by it in 18 states for installing solar photovoltaic projects on rooftops by the executing agency SECI for generation of power. A total roof area of 16,76,233 sq.mts is available on these buildings out of which 60% would be used for power generation. Solar panels would be connected to the grid.
To begin with, 1 MW capacity solar panels each will installed over central government buildings in New Delhi like Nirman Bhawan, Krishi Bhawan, IP Bhawan, Vidyut Bhawan, Shram Shakti Bhawan etc., within 6 months. CPWD has installed 930 kw capacity on Indira Paryavaran Bhawan and Nirman Bhawan in New Delhi so far.
Speaking on the occasion, Venkaiah Naidu and Piyush Goyal have lauded the initiative and said successful implementation of this mission would be a trend setter.
Proposed roof mounted solar power generation in different states is as below:
1. Delhi: 17.00 MW
2. Punjab: 0.80 MW
3. J&K: 0.90 MW
4. UP: 9.30 MW
5. Uttarakhand: 1.10 MW
6. West Bengal: 43.00 MW
7. Jharkhand: 1.00 MW
8. North East: 2.50 MW
9. Maharashtra: 1.7 MW
10. Gujrat: 3.00 MW
11. MP: 1.50 MW
12. Tamil Nadu: 0.50 MW
13. Andhra Pradesh: 2.60 MW
14. Karnataka: 3.80 MW
15. Kerala: 0.70 MW
16. Telangana: 1.40 MW
17. Rajasthan: 6.80 MW
18. Bihar: 2.70 MW
Powered by Capital Market - Live News
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
