Chaired by the Prime Minister Narendra Modi, the cabinet has approved the Mumbai Urban Transport Project Phase-III. The estimated cost of project is Rs 8,679 crore with completion cost of Rs 10,947 crore. The project is expected to be completed in the next 5 years during 13th Plan period.
Western Railway is running suburban services on the existing busy double line between Virar-Dahanu Road which is a part of main line Mumbai-Ahmedabad/Delhi route.
Main line is already over saturated and there is no scope for supplementing suburban services on this line, says a release.
This will also provide an alternate route from Karjat to CSTM via Panvel which will be shorter by 23 km than the existing route via Kalyan and will reduce travel time between CSTM to Karjat by 35 to 40 minutes by slow trains.
Presently, passengers commuting from Kalyan to Vashi/ Panvel or in reverse direction, have to get down at Thane and take Trans Harbour link.
Procurement of new coaches will enhance the quality of service and reduce congestion. The works proposed under trespass control at 22 locations shall significantly reduce trespass and will provide safer environment for the public.
The areas covered by this project are Thane, Palghar, Raigad and Mumbai districts of Maharashtra.
The Mumbai suburban railway network on Central and Western Railways has 376 km route. There are five corridors, two on Western Railway, two on Central Railway and one on Harbour Line of Central Railway.
There is severe overcrowding in the suburban trains specially during peak hours. Due to geographical constraints, spread of the population and location of business areas, the railway network will continue to be the principal mode of mass transport in Mumbai.
To meet the demands of the ever growing commuter traffic, new suburban corridor between Panvel-Karjat (28 km route), new elevated corridor between Airoli-Kalwa(3 km route), quadrupling of Virar-Dahanu Road (63 km route), procurement of 565 new coaches and trespass control measures in mid sections have been included in Mumbai Urban Transport Project (MUTP)- Phase III.
Disclaimer: No Business Standard Journalist was involved in creation of this content
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
