"Based on the review of the status of producing coal blocks which have not yet attained PRC (peak rated capacity) and the coal blocks which were likely to commence production in 2014-15 as well as the information/assurance given by the coal block allocatees for achieving production during 2014-15 is 52.925 MT, said the minutes of a meeting held a fortnight back.
The meeting was held under the chairmanship of Additional Secretary, Coal to review the progress of production of the fuel from captive mines in the current fiscal.
Some of the 21 coal blocks which have come under production but not achieved peak rated capacity are Tasra coal block allocated to SAIL, Moher and Moher Amlori Extension mine alloted to Sasan Power and Barjore North coal block of Damodar Valley Corp (DVC), among others, it added.
Of the total 328 coal blocks identified for allocation for captive purposes, the government has so far allocated 218 and deallocated 80 coal blocks.
The demand-supply gap of coal, which increased by 17.9 per cent to 171 million tonnes (MT) in the last fiscal, is likely to touch 200 MT by 2016-17.
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
