Maha asks RITES to conduct feasibility study on 2nd Metro Line

Image
Press Trust of India Mumbai
Last Updated : Jun 11 2014 | 9:39 PM IST
Maharashtra Government has asked a PSU engineering consultancy company, RITES to conduct the techno-economic feasibility study on the changes in the proposed 2nd Metro line project in Mumbai.
"A new detail project report for
Dahisar-Charkop-Bandra-Mankhurd (2nd line) is being prepared. There will be no hurdle of environmental permission to Charkop depot as it will get shifted to Dahisar," Chavan said while replying to a calling attention motion raised by MLAs from Mumbai in the Legislative Assembly today.
Rail India Technical and Economic Service (RITES Ltd) is a Government of India enterprise under the aegis of Indian Railways.
However, the changes are likely to delay the project which is already behind schedule by five years in the absence of various permissions.
"There is a demand that the second line metro be underground," Chavan said.
The earth-breaking ceremony for
Charkop-Bandra-Mankhurd elevated metro rail was held in 2009 by then President Pratibha Patil, but the work never took off.
The elevated alignment with stations along Link Road and S V road are being opposed.
Overhead wires and proximity to Juhu airport were the major hurdles besides environmental permissions.
The Line 1 Mumbai Metro which connects Versova, Andheri in the western suburbs to Ghatkopar in the eastern suburbs was thrown open to public recently.
The Metro Line 2 was originally planned to be 40 km long from Colaba to Charkop, with Colaba to Mahalaxmi as underground. However, the underground stretch that was extended in the plan up to Bandra (around 20 km) was changed to Charkop-Bandra-Mankhurd (about 35 km), all elevated, primarily due to cost considerations.
*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

First Published: Jun 11 2014 | 9:39 PM IST

Next Story