More storage dams to avert Uttarakhand type tragedy: Expert

Image
Press Trust of India Bhubaneswar
Last Updated : Dec 15 2013 | 12:37 PM IST
Construction of hydro power projects in a planned manner is unlikely to interfere with stability of the Himalayas which offer maximum unexploited hydro power potential, says an expert.
"Scientists fear that the calamity in Uttarakhand a few months ago is a precursor to bigger and more destructive floods. So more storage projects should be taken up in the Himalayan region to avoid such disasters in future," M M Madan, Director (Hydel) at GVK Group says.
Madan expressed the view in a paper presented at the annual convention of Indian National Academy of Engineering (INAE)) which concluded here yesterday.
Favouring more 'run of the river' (ROR) projects without much interference with natural silt movement down the river, he said the hydro projects could not have in any way contributed to the Uttarakhand catastrophe.
"In fact, the Tehri Hydro Project, which is a storage project, absorbed the excess discharge in the Bhagirathi and helped in saving towns of Rishikesh and Haridwar in the downstream," he said claiming that the storage dams "are savior for the downstream population."
INAE is a top body of engineers and technocrats in the country. The Academy which recognises excellence in engineering through its awards, honoured several engineers and scientists at an award function last evening.
Observing that hydro power projects were the second largest contributor of India's energy demand, Madan said this sector received the least priority as compared to thermal projects despite being the most efficient and economical energy source.
Bemoaning that power supply position of India was declining day-by-day due to lack of fuel, poor implementation and poorer hydro-thermal mix, he said it is essential to have 40-60 mix of hydro, thermal and other sources of energy to have a satisfactory power supply position.
"At the end of the 11th plan, this mix was 21-79, creating an imbalance in the power management," said Madan, former Executive Director of NHPC Ltd.
On pros and cons of hydro power development, Madan said today's hydel plants had an efficiency of more than 90 per cent and they had low operational and maintenance costs once the project was commissioned.
On the flip side are high upfront costs when building large hydel plants, large displacement and relief and rehabilitation issues, submergence of vast areas and opposition by pro-environment lobbies.
*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

First Published: Dec 15 2013 | 12:37 PM IST

Next Story