NASA chief acknowledges more trouble with SLS rocket

Image
AFP Washington
Last Updated : Mar 14 2019 | 12:30 AM IST

NASA's administrator said Wednesday its next heavy-lift rocket, the SLS, is running into additional development delays, and the space agency now wants to use private launchers for its next Moon mission.

Boeing has spent years developing the SLS, or Space Launch System, which would be the most powerful rocket ever built, with the goal of resuming manned space missions to the Moon. A capsule for astronauts, Orion, is being built by Lockheed-Martin and Europe for the missions.

After a three year delay, a first unmanned mission around the Moon and back, dubbed EM-1, has been scheduled for June 2020.

But NASA administrator Jim Bridenstine told a Senate hearing that the "SLS is struggling to meet its schedule" and won't be ready in time for the EM-1 mission.

"Last week it came to our attention that we're not going to be able to maintain the schedule," he told the Senate Commerce, Science and Transportation Committee.

It is the first time that NASA has clearly acknowledged the extent of the problems with the SLS, which according to an inspector general's report last August has so far cost the space agency more than USD 12 billion to develop.

Bridenstine then made the shocking announcement that he wants to entrust the EM-1 mission in June 2020 to existing private launch systems, instead of waiting for SLS to be ready.

He did not say which private company he had in mind, but SpaceX would be a natural candidate with its Falcon Heavy rocket. United Launch Alliance's Delta IV Heavy also would be a capable alternative.

United Launch Alliance is a joint venture of Lockheed and Boeing. SpaceX was founded by billionaire Elon Musk.

"We have amazing capability that exists right now that we can use off the shelf in order to accomplish this objective," Bridenstine said.

The new plan would consist of first launching the Orion capsule, and then follow it with the launch of an upper stage for propulsion. The two elements will then dock in orbit for the voyage around the Moon.

No rocket in existence today is capable of lifting both elements together, because of their weight, which is why NASA needed the more powerful SLS.

"I want to be clear, we do not have right now an ability to dock the Orion crew capsule with anything in orbit. So between now and June of 2020, we would have to make that a reality," Bridenstine said.

"NASA has a history of not meeting launch dates, and I'm trying to change that," he said.

Disclaimer: No Business Standard Journalist was involved in creation of this content

*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

First Published: Mar 14 2019 | 12:30 AM IST

Next Story