In the Draft Policy on Sediment Management, the government suggests that no de-silting work of more than 1 cubic metre be carried out in any river without the approval of the authority or the Central Water Commission (CWC).
The draft was circulated to state governments last month and their suggestions have been sought, a senior CWC official said.
"There is a need to establish River Basin Authority for all basins as per recommendation of (the) Doabia committee," the draft policy says.
The draft document also proposes that in order to safeguard the structural integrity of the barrage or a weir, dredging/de-silting/mining activity upstream of structure will not be allowed within approximately 200 metre.
Such activities, it says, will not be allowed within a distance of 800 metres downstream of the structures.
Underscoring the need for providing sufficient flood plain and lakes along the river to moderate flood level, the draft recommends that there should be no encroachment on the flood plain and reclamation of lakes. It also recommends against disconnecting lakes from rivers.
The de-silting of lakes, the draft adds, should be carried out in a way that sediment continuity is maintained.
Stating that the need for constructing storages with sufficient flood cushion, the draft says that stored water needs to be released during non-monsoon period in such a way that silt carrying capacity of river is maintained.
"This will also improve ecology of the river," it says.
Pointing towards littering of solid waste in catchment areas, the draft policy says it contributes to pollution in rivers and suggested local governing agencies to control disposal of the refuse to avoid the situation.
Disclaimer: No Business Standard Journalist was involved in creation of this content
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
