Traffic chaos, loss of trees due to Metro Ph 3 work troubling

Image
Press Trust of India New Delhi
Last Updated : Jan 26 2014 | 7:15 PM IST
Traffic chaos, loss of green cover, pollution and encroachment are the major problems that residents of Delhi are facing due to construction work of Metro Phase III, according to a survey involving metro commuters.
The survey conducted recently had a sample size of 3,500 metro commuters in the age group of 18-45. It was conducted to understand passengers receptability and sentiments about Delhi Metro.
The study, conducted by research firm Market Xcel Data Matrix, revolves around the opinion of daily Metro commuters on the construction work of Phase III, perception and opinion pertaining to addition of an extra coach for women in the Phase III corridor and addition of general coach.
Traffic chaos (74%) and loss of trees (53%) are top two issues residents of Delhi are facing due to Phase III construction, according to the respondents.
The other prominent issues are dust pollution (47%), area encroachment (45%) and noise pollution (38%).
About 87 per cent of the respondents find travelling in Metro convenient and time-saving, while over 90 per cent find it to be the safest mode of transport in Delhi.
A total of 55 per cent of the respondents use the metro at least once a day, while 29 per cent use it twice, including 56 per cent who use it to reach their workplace and 30 per cent who use it to reach their school or college.
Some of the commuters find the rush, which results to increase in transit time, unsatisfactory.
While only 8 per cent of the respondents were aware of eight coaches in trains, 83 per cent knew about six coaches.
Around 93 per cent respondents feel the need for an additional coach apart from the existing one reserved for women on the already operational lines.
About 72 per cent were in favor of one extra coach for women, whereas 78 per cent wanted an additional general coach apart from the existing coaches in the upcoming corridor.
More than 80 per cent respondents are unhappy by heavy rush at entry and exit points.
However, 95 per cent respondents believe that metro construction is streamlined in most cases in terms of causing minimum problems for the residents of the city.
Around 83 per cent respondents expect improvement in DMRC services, including crowd management, scope for drinking water facility and increasing frequency of trains during peak hours.
*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

First Published: Jan 26 2014 | 7:15 PM IST

Next Story