The West Bengal government has given about Rs 14 crore to Eastern Railway to construct a level crossing on the tracks under the arterial Tallah bridge in the city for heavy vehicles to ply when the structure is dismantled, a senior official of the state government said on Thursday.
The official said the ER officials agreed that a level crossing was "technically and policy-wise" possible at the location to allow movement of heavy vehicles when the dismantling of 625 m rail overbridge bridge, which has been declared as most vulnerable, begins later this month.
ER will, however, seek the final nod from New Delhi on the level crossing.
The proposal for the level crossing was mooted by the chief secretary Rajiva Sinha during a high-level meeting on Thursday with senior officials of the ER at its headquarters here.
During the meeting the design for the new bridge to come up in place of Tallah bridge as proposed by the state government was not approved by the Railways, the official said.
A task force including DRM (Sealdah), one engineer of the Railways and principal secretaries to the state public works and transport departments was formed to look into design which would be prepared by the Railways, he said.
"There was also a discussion on whether construction of a cable stayed bridge was possible. The Railways officials agreed to it and said that their plan for the new bridge will be chalked out keeping this option in mind," the official said.
Meanwhile, the demolition of the bridge was postponed to sometime later this month after police failed to chalk out alternate routes for the vehicles plying on the 57-year-old structure.
Demolition of the Tallah bridge, which joins the central part of the city to the vast northern suburbs, was earlier scheduled to start from January 4.
"For the time being light vehicles will continue to ply over the bridge until the diversions are fixed," a senior Kolkata Police officer said.
Six other bridges in the city - Bijon setu, Gouribari Aurobindo Setu, Belgachhia bridge, Tollygunge Circular Road bridge, Dhakuria bridge and Santragachi bridge have also been labelled as 'most vulnerable'.
Disclaimer: No Business Standard Journalist was involved in creation of this content
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
