The Uttar Pradesh government, under the Vrindavan rejuvenation project, has proposed "expansion, renovation and beautification" work of three kilometres riverfront from Kesi Ghat to downstream of the river Yamuna.
The project, which proposes expansion of Kesi ghat by 750 metres into the river floodplain, also involves a mechanism to clean tributaries entering the river and construct interceptor drains to counter overflow of sewer into the river.
"The Ministry of Water Resources claims to have filed the reply on March 15, 2017 without serving a copy on the counsel for the applicant who was permitted to file rejoinder within two weeks after receiving a copy of the reply of the Ministry of Water Resources.
"This is the non-compliance of the order dated February 22, 2017 and consequently the Ministry has no escape but to deposit the cost of Rs 50,000 which is indicated in the order. It shall be done within one week from now. Rejoinder to be filed before the next date of hearing," the bench said, posting the matter for March 31.
The tribunal was hearing a plea filed by nature enthusiast Akash Vashishtha, who claimed that reclamation of the eco-sensitive Yamuna floodplain is being carried out in gross violation of the Water (Prevention and Control of Pollution) Act, 1974 and the provisions of the EIA Notification of 2006.
The plea, filed through advocate Rahul Choudhary, had contended that the project proponent was encroaching right into the river floodplain in order to create space for a new ghat and an interceptor pipeline. This expansion was taking place over and above the already encroached land consisting of illegal colonies and other construction projects.
Disclaimer: No Business Standard Journalist was involved in creation of this content
