Ducon inks pact with Chinese firm for supply of emission controlling catalyst

The company will market Zhejiang Hailiang Ecological's DeNOx catalyst, which is used to reduce nitrogen oxides emission from thermal power plants, in India

Thermal power plant
Thermal power plant
BS B2B Bureau Mumbai
Last Updated : Sep 01 2016 | 3:00 PM IST
The Thane (Maharashtra) based Ducon Infratechnologies Limited has signed an exclusive agreement with China’s Zhejiang Hailiang Ecological Materials Co Ltd to market and distribute DeNOx catalyst for the entire Indian sub-continent. DeNOx catalyst, which is used to reduce nitrogen oxides emission from thermal power plants, is not manufactured in India and it has a replacement life of 3-4 years for every power plant.

As per the new emission regulations issued by Ministry of Environment, Forest & Climate Change (MOEF) in December 2015, it is mandatory for thermal power plants to reduce the nitrogen oxides (NOx) emission down to 100 mg/Nm3 in a phased manner. This reduced limit cannot be met without installation of a selective catalytic reduction (SCR) system that utilises catalyst termed DeNOx catalyst. 

Aron Govil, chairman of Ducon Infratechnologies Limited, said, “We are extremely pleased to have signed this exclusive agreement with this leading Chinese major. This is a significant development for us as the arrangement paves way for expanding our footprints in Indian SCR market with proven low cost DeNOx catalyst technology.”

Ducon’s DeNOx SCR systems features state-of-the-art catalysis technology and control engineering for easy erection and quick tie-in for new and existing power plants. Besides the low capital equipment cost advantage, Ducon’s systems offer versatile use coupled with complete inspection, engineering, removal and replacement services from the company. The results have been proven across multiple plants world over.

Govil added, “From a business perspective, over the next 10 years, the new SCR systems offer tremendous growth opportunity for us as we envisage approximately 256,000 MW power plant capacity in India available for installation of SCR systems at an average revenue of Rs 4.5 million per MW.”

Ducon Infratechnologies Limited provides solutions in the digital and infrastructure space to multiple business segments across varied industries. In the infrastructure sector, it intends to offer complete solutions including execution of turnkey projects in rural electrification, environmental control & material handling areas across India and neighbouring regions. 

*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

First Published: Sep 01 2016 | 2:56 PM IST

Next Story