NMDC's new integrated steel plant to add $1.7 billion to topline

Company's new transportation solution to reduce logistics cost by 55 per cent

iron ore, mining,
Representative Image
T E Narasimhan Chennai
3 min read Last Updated : Apr 12 2019 | 1:39 AM IST
NMDC, the central government-owned mining entity, says its upcoming integrated steel plant at Chhattisgarh could contribute nearly $1.7 billion (Rs 11,800 crore) to annual revenue (assuming full capacity output). It goes on stream in the second half of 2019-20. It is also implementing a slurry pipeline project to transport iron ore, saying this would cut logistics cost by 55 per cent. 

Its strategic plan is to raise iron ore mining capacity, focus on value addition and a global presence. 

The current mining capacity is 43 million tonnes per annum (mtpa), to be raised to 67 mtpa by 2021-22, via expansion at existing sites and new ones. The operating mines — Kirandul, Bacheli and Donimalai — will see capacity raised to a combined 52 mtpa. New mines in a joint venture with Chhattisgarh Mineral Development Corporation will add 15 mtpa.

Iron ore production in 2018-19 (provisional) was 32 mt (it was 35 mt the previous year), translating to 18 per cent market share. Contribution from its Karnataka mines dropped to 28 per cent, from the earlier 34 per cent; the rest came from its Chhattisgarh mines. 

In Karnataka, the company has been facing issues relating to high import, affecting local offtake, and on royalty payment. Around 31.2 mt was sold in the Indian market in FY19 (from 33.5 mt earlier); export was nearly 1.2 mt (from 2.6 mt in FY18). NMDC exports to Japanese and Korean steel mills, through MMTC, under long-term contracts.

However, average sales realisation went up. For lumps in the domestic market, it rose to $62 a tonne (April-December 2018), from $50 in 2017-18. For ore fines, a rise to $50 a tonne, from $41. In export $76 for lumps (from $71); fines saw a drop to $54, from the earlier $56.

The integrated steel plant is part of the value addition strategy. The cost (this estimate is being revised) is stated to be $2.22 billion (Rs 15,300 crore). The rated annual capacity is 2.7 mt. Sources say there will be 60 per cent capacity utilisation in the first year, reaching 100 per cent in the third (and then an estimated $1.7 billion in annual revenue).

The other value addition project is the ore slurry pipeline, at a cost of $415 million for the first phase (Rs 28,700 crore), for sending pellet feed concentrate from Bailadila to Jagdalpur. A 2 mtpa ore processing plant at Bacheli and a 2 mtpa pellet unit at Nagarnar are part of this project, likely to get commissioned by the first half of 2021-22. NMDC estimates the cost of evacuation from Bailadila to Vizag port would reduce to $8 a tonne, from around $17 now.

One subscription. Two world-class reads.

Already subscribed? Log in

Subscribe to read the full story →
*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

Next Story