With 48 hours left for the insertion, India will be the first country to enter the Mars orbit on a maiden mission if it succeeds. India will also be the first Asian country and Isro the fourth space agency to send a satellite to the red planet. European, US and Russian probes have managed to orbit or land on the planet, but after several attempts.
On Monday, Isro scientists will run a test of a main engine and make a small course correction. This is crucial because the engine has been idle for nearly 10 months.
"If you get tense, you tend to make mistakes. So far, things are going fine," said Isro Chairman K Radhakrishnan. The engine will be fired for four seconds and almost half a kg of fuel will be needed for this operation.
If there is a problem in test firing, Isro will use eight small thrusters for altitude control and orientation, which may not offer the original target but will salvage the mission.
On November 5, 2013, Isro's Polar Satellite Launch Vehicle C25 took off from the Sriharikota space station, near Chennai, with five scientific payloads to observe the Martian surface.
| NOT JUST A WEDNESDAY |
|
An objective of the mission is to develop technologies for design, planning, management and operations of an interplanetary mission. The technological objectives include design and realisation of a Mars orbiter with a capability to survive and perform Earth-bound manoeuvres, test a cruise phase of 300 days, Mars orbit insertion, and on-orbit phase around Mars, deep space communication, and navigation, among other things. The scientific objectives of the mission are exploration of Mars surface features, morphology, mineralogy and Martian atmosphere.
The launch was followed by six Earth-bound manoeuvres between November 7 and November 16, 2013, to bring the spacecraft closer to exit the sphere of influence of Earth. The trans-Mars injection was carried out on December 1, 2013, and the spacecraft left the sphere of influence of Earth on December 4, 2013. After that, there was no coming back, whether the mission would succeed or fail.
From Earth's orbit, the spacecraft was moved in a heliocentric path to a destination around 224 million km away, where the craft meets Mars.
Events that will happen 224 million km away from Earth on September 24 will be watched and controlled by Isro's ground stations the Indian Deep Space Network in Bangalore, Goldstone in the US, Madrid, Spain and Canberra, Australia.
Once inserted in orbit, the spacecraft will complete one rotation around Mars in 3.2 Earth days taking pictures and sending data back to Isro for around 6-10 months. The life of the mission will depend on the quantity of fuel left in the craft.
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
)