A bench headed by NGT Chairperson Justice Swatanter Kumar took strong exception on the issue of metro stations extracting ground water without due permission.
The green panel directed the Environment Minstry, Central Ground Water Authority, DMRC, Delhi Jal Board (DJB) and advocate Kush Sharma, counsel for the applicant, to jointly find out how many stations were withdrawing groundwater without proper permission and sort the approvals.
Also Read
The matter was listed for next hearing on November 17.
DJB had earlier told the tribunal that it has not granted permission to the DMRC for extraction of ground water but the metro company has installed 276 borewells across the national capital for which it has no permission.
The NGT was hearing a plea filed by Delhi resident Kush Kalra alleging that DMRC was extracting groundwater instead of using waste water to wash its trains, resulting in depletion of the water table.
It had contended that if any individual installed a borewell without permission in his house, the authorities seal it in no time and slap a fine, but the DMRC has installed 276 borewells right under the nose of authorities but no action has been taken till date.
Referring to a RTI reply, the plea had said DMRC's water requirement was met through borewells and DJB connection. It also said that in order to draw water from the borewells, 3 to 5 HP pumps were used.
"No bottled water is used, groundwater after treatment as per requirement is used for train washing...Borewells have been provided in the depots from where water is sourced.
"Around 400 to 500 litres of groundwater is used for washing one metro train. The water, after washing of metro train, is sent to Effluent Treatment Plant (ETP). The treated water is then used for gardening and the excess sent to drains," the RTI reply had revealed.
Another RTI response received from Delhi Jal Board said no permission had been granted to DMRC for digging borewells.
In yet another such response, a list of metro stations that had been granted such permission was provided by the board to the DMRC, the plea had said while referring to the contradiction between the responses.
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
)