Survey work going on for bullet train project in Varanasi: Ashwini Vaishnaw

Vaishnaw, who is visiting Varanasi, also inspected Kashi station and Rajghat bridge

Ashwini Vaishnaw
Ashwini Vaishnaw (Photo: PTI)
Press Trust of India Varanasi
2 min read Last Updated : Nov 05 2022 | 3:58 PM IST

Survey work is going on to start bullet train services here, Rail Minister Ashwini Vaishnaw said on Saturday.

The proposed alignment of the high-speed rail corridor will pass through Greater Noida, Agra, Lucknow, Prayagraj and Varanasi, he said.

Speaking on the first bullet train project between Mumbai and Ahmedabad, Vaishnaw said, "New things are being learnt through this (project). As this project develops, there will be more development.

"More bullet train corridors will be built in the country. Survey work is going on in Varanasi to start a bullet train."

Vaishnaw, who is visiting Varanasi, also inspected Kashi station and Rajghat bridge.

Kashi station in Varanasi district will be developed at a cost of Rs 350 crore to boost economic activity. Its design should be done keeping in mind Kashi's religious and temple culture, Vaishnaw told reporters.

Plans are also afoot to connect Kashi station with air and water routes and its design is being worked on, he said.

Once the design is finalised, the work will start with the approval of Prime Minister Narendra Modi, Vaishnaw added. Modi represents the Varanasi parliamentary constituency in the Lok Sabha.

Calling the inland waterway a concept of the prime minister, Vaishnaw said the jetty would be linked to Kashi station and construction would take two-and-a-half to three years.

During the inspection of Rajghat bridge, the Union minister said a new bridge with four railway tracks and a six-lane highway above would be built across the Ganga.

Adding that the Railways was laying tracks at the rate of 12 km a day, the minister said new trains would be run when new tracks are laid.

(Only the headline and picture of this report may have been reworked by the Business Standard staff; the rest of the content is auto-generated from a syndicated feed.)

*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

Topics :Ashwini Vaishnawbullet trainsBullet train projectIndian Railways

First Published: Nov 05 2022 | 3:58 PM IST

Next Story