The 22-km project is a road link meant to ease congestion and reduce pollution in the city. The Maharashtra government plans to issue a tender in March and complete the crucial link by 2019. Japan International Cooperation Agency has agreed to provide 80 per cent of the loan for MTHL, which would be developed on cash-contract basis.
The EAC has asked the Mumbai Metropolitan Region Development Authority (MMRDA) to strictly implement a Rs 335-crore environment management plan comprising 15 components including environment monitoring during construction, compensatory mangrove restoration, installation of noise barriers, and mitigation of marine water.
MMRDA assured EAC that funding would not be a constraint for any mitigation measures proposed by the Bombay Natural History Society as environment issues would be given top priority.
EAC said the project implementation should be carried out in accordance with the provisions of CRZ Notification, 2011 without affecting the coastal ecology of the area including flora and fauna. This apart, MMRDA has been asked to obtain all permissions from the authorities concerned prior to commencement of the project and observe all safety requirements onshore and offshore.
It would be binding on MMRDA to compensate the loss of mangroves by plantation of five times the mangroves destroyed during construction.
An MMRDA official told Business Standard: “EAC’s conditions will be fully met. Construction of the ambitious MTHL project will be carried out by adhering to stipulated norms and CRZ notification 2011.”
To monitor the quality of sea water in the area, the state's pollution control board is expected to do online monitoring of the area during construction period. MMRDA would submit regular environmental monitoring reports on a quarterly basis.
Besides, MMRDA would install noise barriers along 9 km (4.5 km on both sides of the sea link) abutting mud-flats where flamingos gather. Prefab structures will be used for the construction of the sea link.
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
)