According to CIL executives, the average cost of what they produce is Rs 900-2,000 a tonne. The average sale price of CIL’s coal is Rs 1,400 a tonne, currently. If the transportation cost is added, at a rail charge from Rs 1,000 to Rs 2,000 a tonne, the final cost of CIL coal comes is in the range of Rs 2,400-3,400.
Though the rail transit cost for every tonne per km is the same for both imported and domestic coal, the better heating ability of imported coal gives it an edge. Coal sold by CIL is lower grade, with a value of 3,500 to 5,500 kcal; imported coal has one of 5,550 to 6,500 kcal. The ash content is also low at two per cent in imported coal; in domestic produce, it is 25 per cent. This means to generate a unit (kilo watt) of power, 25 per cent less coal is required if it is imported.
The global price in 2008 touched $130 a tonne. Since then, it has been sliding, from $80 a tonne in December 2013 to $50 in December 2014. At a foreign exchange rate of Rs 62 for a dollar, the landed price is Rs 2,700 to Rs 3,000 a tonne. After adding transport cost, it is Rs 3,700-5,000 a tonne for power companies. So, for generating the same amount of power as from a tonne of imported coal, the cost of domestic coal would be Rs 3,000-4,250, a cost differential of 15-23 per cent.
A senior power executive said plants operating on domestic coal can, therefore, replace at least half their need with imported coal. “Depending on the configuration, they can save on cost since heat value is higher in imported coal,” said the executive.
“For power plants based in Gujarat, Andhra Pradesh and other western parts, the distance is around 1,500 km and more. The transport cost is above Rs 2,000 a tonne of coal. In such a case, getting imported coal which is also of better quality looks viable,” said a power sector executive.
NTPC, which has most of its power plants near coal mines, has the lowest transport cost. Independent power producers face not only transport cost but a loss of six to eight per cent of the amount in rail transit, said a coal industry official.
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
)