Govt panel to review progress of twin city MRTS project

The first meeting of this 15-member monitoring cum advisory committee is scheduled to be held on November 5

Image
BS Reporter Bhubaneswar
Last Updated : Nov 03 2014 | 9:53 PM IST
A high-level panel of the state government headed by chief secretary G C Pati would soon take stock of the progress made in respect of preparation of detailed project report (DPR) for the proposed Mass Rapid Transit System (MRTS) connecting the twin cities of Bhubaneswar and Cuttack.

The first meeting of this 15-member monitoring cum advisory committee is scheduled to be held on November 5.

The committee's mandate is to review and monitor the progress of preparation of DPR for the MRTS project and also to advice on overall planning, designing and policy matters pertaining to the DPR preparation.

Also Read

Hyderabad-based Balaji Railroad Systems Ltd (BARSYL) engaged to prepare DPR for the MRTS project, will make a detailed presentation on their preliminary study and detailed roadmap.

The MRTS to cover a distance of approximately 30 km, may become a reality in the next five years.

The Government of India will bear 50 per cent of the project cost under 'Urban Transport Planning Scheme'. The rest 50 per cent will be contributed by the Odisha government.

The state government had inked a pact with BARSYL in August this year for preparing DPR for the project.

The consultant to be paid Rs 2.5 crore for the assignment, would submit the DPR within 10 months of signing of the pact.

The DPR work involves selection of final assignments, engineering surveys, selection of suitable track structure, suggestions for traction system and power supply, undertaking financial and sensitivity analysis, preparation of environment management plan (EMP) and working out an implementation strategy.

In August last year, the state government had mooted a monorail transit system for the twin cities of Bhubaneswar and Cuttack. Monorail system is a technological innovation entailing many advantages for optimum flow of passengers.

It provides a smooth ride quality, higher passenger capacity, energy efficiency, lower capital and operating costs and environment friendly transport needs.

The construction cost of the monorail system is pegged at Rs 150 crore per km.
*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

First Published: Nov 03 2014 | 8:18 PM IST

Next Story