Thirty-six highway contracts, totalling a length of 2,549 km, had been awarded in the April-September period of 2015-16. According to NHAI data, 29 projects of 2,130 km, estimated at Rs 26,000 crore, were awarded in the first half of FY17. Half of the total contracts awarded this year were on hybrid annuity model, where the government would bear 40 per cent of the total highway cost.
As many as 11 projects were awarded on engineering, procurement and construction basis. One such project in Rajasthan, totalling a length of 104 km and valued at Rs 1,249 crore, was bagged by Larsen & Toubro.
Road Transport Minister Nitin Gadkari recently announced Rs 2 lakh crore worth of highway projects in the poll-bound states of Punjab and Uttar Pradesh (UP). According to official data, though, only three projects in Punjab have made it to the list of 29 contracts awarded since April, while UP bagged only one project.
Three projects — Ladhowal Bypass, Rupnagar-Phagwara, Kharar-Ludhiana — were bagged by Eagel Infra, GR Infra and Ashoka Concessions, respectively. The total cost of these three hybrid annuity projects is Rs 3,333.34 crore.
The Lucknow-Sultanpur highway project would be executed by Dilip Buildcon; the estimated cost of which is Rs 1,471 crore. It would also be built on the hybrid annuity model.
The travel time from New Delhi to Amritsar is likely to come down by two-and-a-half hours, as an expressway has been planned between these two cities, stretching all the way to Katra in Jammu & Kashmir (J&K). The aim is to cater to the pilgrims visiting the holy city in Punjab and Vaishno Devi shrine in J&K.
In Uttar Pradesh, the ministry announced road projects worth Rs 2 lakh crore. An expressway connecting Kanpur and Lucknow has also been envisaged. It would come up at a cost of Rs 1,500 crore and would reduce the current travel time between the two cities to 35 minutes, from an hour.
In April-September 2016, Gujarat and Rajasthan bagged seven and eight contracts, respectively.
While five highways would be built on hybrid annuity model in Rajasthan, two are toll projects.
Barring the Kamrej-Chalthan highway in Gujarat, the remaining six projects would come up on hybrid annuity model.
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
)