Uttar Pradesh to invest Rs 20,000 cr in improving power transmission infra

State peak hour power demand estimated to jump 35% to 30,000 mw by 2024

power distribution, electricity, electricity transmission
Virendra Singh Rawat Lucknow
2 min read Last Updated : Jul 29 2019 | 5:47 PM IST
The Uttar Pradesh government plans to invest Rs 20,000 crore in five years for improving power transmission, seeking to provide uninterrupted electricity to industries as it aims to become a $1-trillion economy.

It's estimated that the peak hour energy demand in the state will increase by more than 35 per cent from 22,000 megawatt (mw) at present to nearly 30,000 mw by 2024. 

In 2016, the peak hour power demand was only 16,500 mw. The policy of electrifying all households in the urban and rural areas, coupled with incremental demand is pushing up the power consumption in the state.

According to UP energy minister Shrikant Sharma, the government had already increased power transmission capacity 60% from 15,000 mega volt amp (MVA) in 2017 to the current level of 24,000 mva.

“We are working on a blueprint based on projected power demand in 2032,” Sharma said on Sunday at an event on ‘power and renewable energy’, which was organised as part of a foundation-laying ceremony of industrial projects totalling Rs 65,000 crore.

He said power was the backbone of industry and Uttar Pradesh was committed to providing 24 hour power supply to industrial areas. “The government is working on all the aspects of power matrix including generation, transmission and distribution,” said Sharma.

The state is working on two-pronged strategy of increasing power generation and cutting generation cost. The plant load factor of state run power generation units have jumped 13.8% to 78.83% over the last 2 years, Sharma said.

“The state power grid capacity has also jumped from 18,000 mw in 2016 to more than 24,000 mw. Similarly, power import capacity of grid has increased to 12,850 mw from 8,700 mw in 2017.” 

The minister further announced by 2021, prepaid and smart electricity meters would be installed at premises of all rural and urban power consumers respectively. Over the past 2 years, nearly 11 million households in UP were provided with power supply under the central Saubhagya scheme, while more than 1,78,000 hamlets were electrified.

One subscription. Two world-class reads.

Already subscribed? Log in

Subscribe to read the full story →
*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

Topics :Power SectorPower TransmissionUttar Pradesh governmentelectricity sector

Next Story