Mahatma Gandhi's Dandi March will be the theme of Sabarmati Station in Ahmedabad which will be the terminating station of the proposed high-speed rail corridor between Mumbai-Ahmedabad, a senior official said today.
Passengers boarding the bullet train from Sabarmati Station will have to pay Rs 3,000 to reach Mumbai, he told reporters.
It would the first bullet train station whose design has been finalised by the National High Speed Rail Corporation Ltd.
Achal Khare, the managing director of NHSRCL, said the cost of building the station is approximately Rs 250 crore.
He said the station area will have a three-level parking that can accommodate around 1,500 vehicles. While one level will be for cars, another will be for bus and the third will be for autos, thus ensuring seamless travel for passengers.
While passengers from two metro stations and stations on the Indian Railway network can arrive at Sabarmati passenger terminal hub, they can move to Sabarmati Station via a foot-over-bridge connecting the two buildings, which are 400 metres apart, and board the bullet train from there.
"It will be a state-of-art complex with Dandi March being the theme of the edifice," Khare said.
Roof-top solar panels will be designed resembling a revolving charkha and the terminal will be connected with a 400-metre foot-over-bridge with the platforms.
Construction work for the government's ambitious project is expected to start from December this year after completion of land acquisition, Khare said.
The proposed bullet train will run approximately 508 km between Mumbai and Ahmedabad at a top speed of 320 kmph. It will make 70 trips per day between Mumbai and Ahmedabad at an interval of 20 minutes and each rake will have 10 coaches.
The deadline for the project is August 15, 2022.
Disclaimer: No Business Standard Journalist was involved in creation of this content
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
