Rural Development minister Abdul Haq launched the flood protection works with the foundation laying of bunds on Rambiara stream at Heff in Shopian and Roh and Bane-Nowgam in Anantnag districts.
The Rural Development Department formally launched the flood protection works on various rivers and tributaries and is using latest 'durable and stronger' gabions for the construction of protection bunds instead of old crates, an official spokesperson said today.
Stressing on the people to avoid encroaching the state land especially in flood prone areas, the minister said "the violators will be dealt with strictly.
"I have given clear cut directions to officers that no encroachment will be allowed. We will remove all encroachments that are identified during execution of flood protection project," he said.
"The methodology being utilised for protection, treatment
and stabilisation of Trikuta Mountain slopes comprises interventions which involve highly sophisticated techniques like installation of high energy absorption rockfall barriers, high tensile strength steel wire-mesh, rolled cable net and concrete work including shotcrete, cladding, drilling grouting, anchoring as well as other site specific treatments," Sahu said.
The rockfall barriers, manufactured in Switzerland, can arrest boulder upto 16 metric tons in weight falling freely from upto 60 metre height or rolling down 100 metre from a slope.
As slopes of the Vaishno Devi Project are steep high rockfall barriers of 5000 and 8000 kilojoules energy absorption are being used on these mountains for the first time in India.
Vohra was informed that extensive work is also underway to construct rain shelters on the tracks.
So far, about 15 km track has been covered with shelter sheds.
"High quality heavy gauge CGI sheets are being used to cover the sheds which absorb the thrust of the smaller falling stones," Sahu said.
An eight feet high welded mesh fence has been erected all along the track to prevent any pilgrim from accidentally falling down the slopes.
"As of now this fencing has been erected along 18 km of the tracks, at an approximate cost of Rs 7 crore," he said.
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
