India's LVM 3 X launch with crew module between Dec 15 and 20

Image
Press Trust of India Sriharikota (AP)
Last Updated : Nov 29 2014 | 7:51 PM IST
Inching towards its human space programme, India would test a crew module recovery experiment even as it would study the vehicular performance of its latest Geosynchronous Satellite Launch Vehicle (GSLV - Mark III) from Satish Dhawan Space Centre here between December 15 and 20.
"ISRO would launch its heaviest rocket GSLV-Mark III (LVM 3 X mission) sometime between December 15 and 20. The rocket would also carry a crew module to test its re-entry characteristics," M Y S Prasad, Director, Satish Dhawan Space Centre, told reporters here.
The launch intends to test the atmospheric characteristics and stability of the updated rocket on its way up and would study the crew module on its re-entry into the atmosphere.
While the rocket would cost Rs 140 crore, the crew module would cost Rs 15 crore, he said.
Elaborating on the updated GSLV Mark III, S Somanath, Project Director, GSLV Mark III, said, "The rocket can carry upto four tonne payload. This is the heaviest rocket India has ever launched. It is 630 tonne at lift off. We would test only the first two stages and not the cryogenic stage."
"The cryogenic engine is under development and it will take more two years to be ready," said Prasad.
Since Indian government has not officially approved sending humans into space so far, Prasad said the crew module would not carry any living being and it is only for study purposes.
Explaining the process, Project Director of Crew Module, S Unnikrishnan Nair, said after getting separated from the rocket around 126 km, it would be stabilised by thrusters designed on board.
"The three tonne weighing crew module would use four set of parachutes to safely land on the surface of the sea at 7 metre per second. It will land some 180 km from Indira Point of Andaman and Nicobar Islands. From the lift off to the crew module splashing into the sea, it will take around 20 minutes," he said.
The cup cake-shaped crew module is 2.5 metre tall and 3.5 metre in diameter, he said.
The capsule, tentatively designed to carry three astronauts, would be recovered by Indian Coast Guard ships. A practice of the recovery was done on October 31 with Coast Guard ship ICGS Samudra Paheredar, he added.
*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

First Published: Nov 29 2014 | 7:51 PM IST

Next Story