The bridge that collapsed in the Italian port city of Genoa was considered a feat of engineering innovation when it was built five decades ago, but it came to require constant maintenance over the years. Its design is now being investigated as a possible contributor to its stunning collapse.
The Morandi Bridge was severed in its midsection during a heavy downpour Tuesday, killing at least 39 people. Italian prosecutors focused their investigation into possible design flaws or inadequate maintenance of the 1967 bridge.
Engineering experts said the disaster points to the challenges of maintaining any aging bridge, regardless of its design.
"What the general public does not comprehend is that bridges have been traditionally designed in the past for a life span of 50 years," said Neil Hawkins, a professor emeritus of engineering at the University of Illinois, who specializes in reinforced and prestressed concrete design.
"The environment in which the bridge exists can have a major effect on how much it can last beyond that 50-year design life span." The structure is a cable stayed bridge designed by Italian engineer Riccardo Morandi, who died in 1989.
Among its unusual features were its concrete-encased stay cables, which Morandi used in several of his bridge designs instead of the more common steel cables. There are two similar bridges in the world, in Libya and Venezuela.
Experts have said a number of factors could have contributed to the collapse, including wear and tear from weather and traffic that surpassed what the bridge was originally built to sustain.
"Genoa is a port city so that there can be marine effects and also it is a major industrial center so that there can be air pollution that impairs the concrete," Hawkins said in an e-mail.
"Whether any of these effects, or other major deficiencies in the foundations, were present I have no knowledge. But all can contribute to a bridge failure."
The Genoa bridge, along with the two similar bridges in Libya and Venezuela, have deteriorated at "unimaginable speeds," Brencich told Sky News Italian television station Wednesday. "Since this bridge was under constant maintenance, the time had come to consider a replacement for the bridge."
Disclaimer: No Business Standard Journalist was involved in creation of this content
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
