'Openings provided in Silkyara tunnel to help stranded commuters escape'

Silkyara tunnel is a single-tube tunnel and is divided into two inter-connected corridors by a partition wall

Silkyara in Uttarkashi
Entrance of the Silkyara tunnel where rescue operations are in progress
Press Trust of India New Delhi
3 min read Last Updated : Dec 06 2023 | 6:02 PM IST

Amid reports raising questions on why under-construction Silkyara tunnel in Uttarkashi did not have a separate escape tunnel, the government on Wednesday said a separation wall was provided in the tunnel with egress openings at regular intervals that could be used as an escape route during an emergency.

The 41 workers, who were trapped in the tunnel from November 12, were rescued on November 28.

In a written reply to a question in the Rajya Sabha, Union Road Transport and Highways minister Nitin Gadkari said, "In the Silkyara bi-directional tunnel on Dharasu-Yumunotri highway (NH-134), a provision of separation wall has been provided at the centre of the carriageway along with egress openings at an average interval of 565 metres for vehicular crossover and at an average interval of 300 metres for pedestrian cross passage for escape purposes during the emergencies."

Gadkari was asked whether the government has conducted a probe as to why Navayuga Engineering Company Ltd (NECL) did not build a rescue route, as is the norm in tunnel construction.

The National Highways and Infrastructure Development Corporation Ltd (NHIDCL) is constructing the tunnel through Hyderabad-based Navayuga Engineering Company Ltd.

Silkyara tunnel is a single-tube tunnel and is divided into two inter-connected corridors by a partition wall.

Each inter-connector corridor can work as an escape passage for the other.

On whether the government had reviewed safety norms after the collapse of the tunnel in 2019, the minister said the Silkyara tunnel on the Dharasu-Yumunotri highway (NH-134) is being built under the Engineering, Procurement and Construction (EPC) mode, wherein the design responsibility lies with the EPC contractor.

"After encountering minor spalls/falling of debris-forming cavities during construction in 2019, the construction sequences and primary support system are reviewed from time to time on the basis of actual ground behaviour observed and are approved by authority's engineer engaged for the project, which are executed under the supervision of officials of NHIDCL," he added.

The minister said on the intervention application filed by the Ministry of Defence, the Supreme Court in 2021 permitted widening of the three strategically important National Highways -- Rishikesh-Mana (NH-7), Rishikesh-Gangotri (NH-34) and Tanakpur-Pithoragarh (NH-9) -- to two-lane with paved shoulder (10-metre wide pavement) under Char Dham Pariyojana.

The 4.5-kilometre Silkyara tunnel project in Uttarakhand, which is part of the Centre's strategic 900-km 'Char Dham Yatra All Weather Road', aims to improve connectivity to four holy towns of Yamunotri, Gangotri, Kedarnath, and Badrinath in Uttarakhand.

(Only the headline and picture of this report may have been reworked by the Business Standard staff; the rest of the content is auto-generated from a syndicated feed.)

*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

Topics :UttarakhandParliament winter session

First Published: Dec 06 2023 | 6:02 PM IST

Next Story