The Railways has successfully conducted a trial run of a tower wagon on India's first cable-stayed rail bridge, the Anji Khad Bridge, in Jammu and Kashmir's Reasi district, paving the way for the start of rail services to Kashmir in January next year.
Union Railway Minister Ashwini Vaishnaw shared a video clip of the trial run on the social media platform X.
The railway ministry issued a statement, saying, "Giving wings to connectivity in Jammu and Kashmir, the trial run of a tower wagon on India's first cable-stayed rail bridge, the Anji Khad Bridge, was successfully completed for the USBRL project." The work on the railway bridge at Anji Khad was completed last month. The completion of the bridge received praise from Prime Minister Narendra Modi.
The Udhampur-Srinagar-Baramulla Railway Link (USBRL) project is aimed at providing rail connectivity between the Kashmir Valley and the rest of the country.
The Anji Khad Bridge, featuring a single pylon with a height of 331 metres above the riverbed, is yet another engineering milestone achieved by the Indian Railways under the USBRL project, officials said.
Described as a "true engineering marvel", the bridge has 48 cables on its lateral and central spans. Work on its pylon began in 2017, and the structure stands 191 metres above its foundation level, they added.
It is the second-highest railway bridge after the iconic arch bridge over the Chenab at Kauri, which is the world's highest railway bridge at 359 metres above the riverbed 35 metres higher than the Eiffel Tower in Paris.
The Anji Khad Bridge has a total length of 473.25 metres, with the viaduct measuring 120 metres and the central embankment 94.25 metres, the officials said.
Minister of State for Railways Ravneet Singh announced in November that Prime Minister Narendra Modi is likely to inaugurate the Vande Bharat train connecting Kashmir to New Delhi on the USBRL in January.
With the expected commissioning of train services in phases, the Railways has completed 255 kilometres of the 272-kilometre USBRL project, leaving only a small stretch between Katra and Reasi to be completed by December.
(Only the headline and picture of this report may have been reworked by the Business Standard staff; the rest of the content is auto-generated from a syndicated feed.)
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
)