Authorities have assured that work of shifting electricity poles would be done soon to ensure regular supply of power in Rampur, whose residents have been suffering from long periods of outages.
The load shedding has been caused due to the shifting of high tension electricity poles for the construction of a by-pass in the area.
District Magistrate C P Tripathi today assured people that the shifting of lines will be completed by September 5.


