RIL may arrest decline in gas output from KG-D6 field

Production is likely to begin rising by the end of the year and may increase to 16 mmscmd by 2015 as RIL-BP do repair work

Press Trust of India New Delhi
Last Updated : Sep 19 2013 | 6:29 PM IST
Reliance Industries and its partner BP plc of the UK may have finally been able to arrest the steep decline in output from their main gas field in the eastern offshore KG-D6 fields as they work to revive closed wells.

"It was anticipated that the production from KG-D6 will drop to about 11 million standard cubic meters per day by October but that is not happening. The output is around 13.4 mmscmd and is unlikely to drop below 13 mmscmd," a senior Oil Ministry official said.

The production is likely to begin rising by the end of the year and may increase to 16 mmscmd by 2015 as RIL-BP do repair work to revive six out of the nine wells on Dhirubhai-1 and 3 (D1&D3) fields that were shut due to high water and sand ingress.

The oil regulator DGH has already approved a $662 million production work programme and budget for 2013-14, which includes six work over jobs in the d1&D3 fields. Remedial measures for managing water production in these fields form a major component to the budget, he said.

RIL-BP are formulating suitable compression configuration to deal with declining reservoir presure and maximise recovery from the fields.

KG-D6 output will see a big upswing in 2016-17 when newer fields in the block are brought to production.

Gas output from KG-D6, as per the Directorate General of Hydrocarbons (DGH), in 2016-17 will be 19.781 mmscmd.

The ministry, he said, has cleared RIL's $1.529 billion investment in developing four satellite gas finds in KG-D6 block which would produce 10 mmscmd in three years.

The Bay of Bengal KG-D6 fields, which began gas production in April 2009, had hit a peak of 69.43 mmscmd in March 2010 before water and sand ingress led to shutting down of more than one-third of the wells.

This peak output comprised 66.35 mmscmd from Dhirubhai-1 and 3, the largest of the 18 gas discoveries on the KG-D6 block, and 3.07 mmscmd from MA field, the only oil discovery on the block.

D1&D3 output has since fallen to about 10 mmscmd while gas production from MA field, which had hit a peak of 6.78 mmscmd in January 2012, has fallen to just 3.48 mmscmd.
*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

First Published: Sep 19 2013 | 6:13 PM IST

Next Story