Govt eyes Rs 45,000 cr from power transmission monetisation assets by FY25

The government aims to garner over Rs 45,200 crore through monetising power transmission assets by FY 2025 as part of its ambitious asset monetisation plan.

Representative image
Representative image
Press Trust of India New Delhi
2 min read Last Updated : Aug 23 2021 | 10:34 PM IST

The government aims to garner over Rs 45,200 crore through monetising power transmission assets by FY 2025 as part of its ambitious asset monetisation plan.

Finance Minister Nirmala Sitharaman on Monday announced a Rs 6 lakh crore National Monetisation Pipeline (NMP) that will look to unlock value in infrastructure assets across sectors ranging from power to road and railways.

The transmission assets considered for monetisation during FY 2022-25 aggregate to 28,608 circuit (ckt) kms.

These include transmission assets of 400 KV and above of Power Grid Corporation of India Limited (PGCIL).

The total value of assets considered for monetisation is estimated at Rs 45,200 crore over FY 2022-25, the NMP document said.

"During FY22, transmission assets considered with indicative value of Rs 7,700 crore. Assets to be monetized during FY22 includes the PGCIL's InvIT issue transaction for which has already been concluded during April-June quarter of FY22.

"FY23, FY24 and FY25 -- Aggregate length of 23,734 ckt kms has been considered for monetisation during this period," it said.

Out of the total transmission asset base of PGCIL, the scale of transmission assets with capacity of 400 KV and above (1.56 lakh ckt kms) was estimated.

The monetisation potential is available in this category of long-distance transmission assets. This includes a mix of Tariff Based Competitive Bidding (TBCB) and Regulated Tariff Mechanism (RTM) assets.

While most TBCB assets of PGCIL are expected to be bought under the PGCIL InvIT over a period of time, inclusion of additional assets from RTM category is critical to achieve the required scale in monetisation, it said.

The transmission assets considered for monetisation over FY 2022-25 depend on factors such as transmission charges, asset availability and asset mix. The total transmission assets considered for monetisation aggregate to 28,608 ckt kms.

The indicative monetisation value of the transmission assets has been considered based on a factor of Rs 1.58 crore per ckt km.

"It may be noted that this is only an indicative value and the actual realisation and valuation would depend on factors such as asset profile, transaction structure and market conditions," the NMP said.

Union Budget 2021-22 had identified monetisation of operating public infrastructure assets as a key means for sustainable infrastructure financing.

(Only the headline and picture of this report may have been reworked by the Business Standard staff; the rest of the content is auto-generated from a syndicated feed.)

*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

Topics :Power TransmissionIndian EconomyPower Sector

First Published: Aug 23 2021 | 10:34 PM IST

Next Story