“The vision behind the OSOWOG mantra is “The Sun Never Sets” and is a constant at some geographical locations, globally, at any given point of time. With India at the fulcrum, the solar spectrum can easily be divided into two broad zones - the Far East, which would include countries like Myanmar, Vietnam, Thailand, Lao, Cambodia etc. and the far West which would cover the Middle East and the Africa region,” MNRE said in the terms of reference in the RfP published to hire consultants for OSOWOG.
With regards to the MoU signed with the ISA, NTPC Chairman Gurdeep Singh said, “The MoU will help NTPC share its technical and project management expertise with ISA member countries. We are thankful to the governments of Togo and Mali for giving us the opportunity to build 285 Mw and 500 Mw solar projects, respectively. We are eager to work closely with the 47 countries for which we have signed MoU with ISA.”