The East Coast Railway (ECoR) will set up a 'Waste to Energy Plant' at the Carriage Repair Workshop at Mancheswar area here.
Foundation stone of the plant was laid by the general manager of ECoR Vidya Bhushan on Monday, an ECoR statement said.
It said lots of non-ferrous scrap is being generated in the Carriage Repair Workshop in Bhubaneswar which has no efficient method of disposal. As a result, they find their way to landfills, which is environmentally hazardous.
Carriage Repair Workshop, Mancheswar has found a way for tackling this problem in a patented technology called 'POLYCRACK', it said.
"It is worlds first patented heterogeneous catalytic process which converts multiple feedstocks into hydrocarbon liquid fuels, gas, carbon and water," the release said.
Polycrack Plant can be fed with all types of plastic, petroleum sludge, unsegregated MSW with moisture up to 50 per cent, ewaste, automobile fluff, organic waste including bamboos, garden waste and Jathropa fruit and palm bunch.
Noting that polycrack has many advantages over the conventional approach of treating solid waste, the ECoR said pre-segregation of waste is not required to reform the waste. Waste as collected can be directly fed into Polycrack.
It has high tolerance to moisture hence drying of waste is not required and waste is processed and reformed within 24 hours. It is an enclosed unit hence the working environment is dust free.
All constituents are converted in to valuable energy thereby making it zero discharge process, the release said adding gas generated in the process is reused to provide energy to the system thereby making it self reliant of its energy requirement and also bring down the operating cost.
There is no atmospheric emission during the process unlike other conventional methods except for combustion gases which have pollutants less than the prescribed norms the world over. It operates around 450 degrees, making it a low temperature process when compared with other options.
The waste to energy Plant will be constructed in four months and the target date of its commissioning is January 2020. About Rs two crore will be spent for commissioning of this polycrack plant, the release added.
Disclaimer: No Business Standard Journalist was involved in creation of this content
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
