Raju said the state-of-the-art facility in Nasik will not require any major investment to reconfigure it to produce the fifth generation fighter aircraft (FGFA).
He said there was much in common between the FGFA and the Sukhoi 30MKI jet as both had structural similarities and the plant was well equipped to produce the new generation stealth fighter for which India and Russia have been in negotiations for nearly a decade.
"Definitely, it can be used for the FGFA. It will need a little bit of augmentation. We will not need major investment," Raju, the chairman and managing director of HAL, told PTI.
The facility at Nasik is set to fall idle after it delivers the last batch of 35 aircraft out of the total order of 222 to the Indian Air Force.
In 2007, India and Russia had inked an inter-governmental pact for the FGFA project but no concrete decision has yet been taken on it.
Pitching for the FGFA project, Raju said it would be an opportunity for India to acquire high technology which has not been offered to it by any other country except Russia.
"I will not comment on the justification on expenditure on the project. But, as a country, if we are looking for fifth generation technology and if somebody has offered it to us, then definitely I would like to go for it regardless of the expenditure," Raju said.
There is a view in the defence establishment that India should not go for the project considering the possible cost which has been roughly estimated at around USD 25 billion (around Rs 1.61 lakh crore).
The defence ministry is likely to soon take a call on a report submitted recently by a high-level committee set up by the government to examine various aspects of the project.
In December 2010, India had agreed to pay USD 295 million (Rs 1,897 crore) towards the preliminary design of the fighter, which is called the 'Perspective Multi-role Fighter' in India.
However, the negotiations faced various hurdles in the subsequent years.
In February last year, India and Russia revived talks on the project after a clearance from then Defence Minister Manohar Parrikar.
Raju said the Nasik plant may be converted to a maintenance facility for the Sukhoi fleet if the FGFA project does not take off. The delivery of the remaining Sukhoi jets is likely to be over by early 2020.
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
)