Aim to restart cryogenic stage in flight for mission benefits: Isro chief

According to an ISRO release, during this test, the ignition of the engine Thrust Chamber was carried out with a multi-element igniter in vacuum

V Narayanan, ISRO Chairman
Sriharikota: Indian Space Research Organisation (ISRO) Chairman V Narayanan (Photo: PTI)
Press Trust of India Bengaluru
3 min read Last Updated : Feb 08 2025 | 4:45 PM IST

A day after ISRO successfully carried out the ignition trial of the indigenous CE20 cryogenic engine, its Chairman and Secretary of Department of Space V Narayanan on Saturday said that the test would be advantageous to missions.

The Chairman also said there were no glitches as reported in the media in ISRO's first Space Docking Experiment (SpaDeX) mission.

"We want to restart the cryogenic stage in the flight for mission advantages. So, we recently carried out a test towards that," Narayanan told PTI on the sidelines of the 15th Biennial Edition of Aero India International Seminar 2025, held in Bengaluru.

On February 7, ISRO successfully carried out the ignition trial of the indigenous CE20 cryogenic engine powering the upper stage of LVM3, with a multi-element igniter under vacuum conditions, which simulates the engine ignition in the vacuum condition of space. This test was carried out in the High-Altitude Test Facility at ISRO Propulsion Complex in Mahendragiri, Tamil Nadu.

According to an ISRO release, during this test, the ignition of the engine Thrust Chamber was carried out with a multi-element igniter in vacuum, under the tank pressure conditions that are expected to prevail at the time of restarting the cryogenic engine in flight.

The performance of the engine and the facility during the test was normal and as expected, it added.

On reports in the media on glitches in the SpaDeX mission, Narayanan said, "No glitches, right now it is docked. We are going step by step. We are studying and then we are planning to do a lot of experiments."  On January 16, the space agency successfully performed the docking of satellites as part of the Space Docking Experiment (SpaDeX) and it also announced that post docking, control of two satellites as a single object was successful. In this mission, NVS-02 navigation satellite was successfully injected into the intended Geosynchronous Transfer Orbit.

But on February 2, ISRO issued an update stating that the orbit raising operations towards positioning the satellite to the designated orbital slot could not be carried out as the valves for admitting the oxidizer to fire the thrusters for orbit raising did not open.

The ISRO chairman was the chief guest at Aero India International Seminar 2025. This year, the international conference on military airworthiness explored the topic 'futuristic aerospace technologies: challenges in design validation'.

(Only the headline and picture of this report may have been reworked by the Business Standard staff; the rest of the content is auto-generated from a syndicated feed.)

*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

Topics :Isro manned missionIsro projectsIsro rocket launch

First Published: Feb 08 2025 | 4:45 PM IST

Next Story